Pre-Installation Preparation

Proper installation is key to ensuring the performance of the linear bearing system. Before installation, carefully read the installation instructions and prepare the necessary tools and equipment.

Basic Installation Requirements

Installation Surface Requirements

Item Requirement
Flatness Depends on product accuracy class, typically ≤ 0.05 mm/m
Surface Roughness Ra ≤ 6.3 µm
Cleanliness Free from oil, dust, debris
Threaded Holes Meet specified position and depth requirements

Shaft Requirements (Recirculating Units)

Item Requirement
Diameter Tolerance h6 or stricter
Straightness ≤ 0.05 mm/m
Surface Roughness Ra ≤ 0.4 µm
Hardness HRC 58-64 (hardened steel)

Linear Guideway Installation Steps

Installation Procedure

  1. Clean - Thoroughly clean installation surfaces and guideways
  2. Position - Place guideway at installation location
  3. Secure Center - First secure the center bolt of the guideway
  4. Align - Use measuring tools to verify straightness
  5. Secure Ends - Secure the bolts at both ends of the guideway
  6. Sequential Securing - Secure other bolts sequentially from center to ends
  7. Check - Check if carriage slides smoothly on guideway
  8. Install Carriage - Carefully install carriage, avoid ball dropout

Recirculating Unit Installation Steps

Installation Procedure

  1. Clean - Clean shaft and recirculating unit
  2. Check - Verify shaft dimensions and surface quality
  3. Lubricate - Apply appropriate amount of lubricating oil on shaft
  4. Install - Carefully slide recirculating unit onto shaft
  5. Position - Adjust to correct position
  6. Secure - Use appropriate securing method
  7. Test - Test run to confirm no abnormalities

Bolt Tightening Specifications

Bolt Size Tightening Torque (Nm)
M3 1.0 - 1.5
M4 2.5 - 3.0
M5 4.0 - 5.0
M6 8.0 - 10.0
M8 20.0 - 25.0
M10 40.0 - 50.0

Note: Please use a torque wrench to avoid over-tightening causing deformation.

Precautions

Important Warnings

  • Avoid Impact - Avoid striking or impact during installation
  • Keep Clean - Prevent dust and contaminants from entering
  • Correct Orientation - Pay attention to installation direction and positioning
  • Prevent Ball Dropout - Handle carriages with special care
  • Proper Lubrication - Ensure adequate lubrication
  • Avoid Preload - There should be no excessive preload during installation

Post-Installation Checks

Check Items

  • Smooth sliding motion without sticking
  • No abnormal noise or vibration
  • Bolts are properly secured
  • Guideway or shaft straightness meets requirements
  • Adequate lubrication
  • Seals are intact

Recommended Tools

  • Torque wrench (appropriate specifications)
  • Straightness measuring instrument or laser alignment device
  • Flatness measuring tools
  • Cleaning tools and solvents
  • Lubricating grease
  • Protective gloves
連結已複製!